Saturday, January 25, 2020

Malaysian construction industry system

Malaysian construction industry system INTRODUCTION The Malaysian construction industry is undergoing a transitional change from an industry employing conventional technology to a more systematic and mechanized system. This new system is now known as the Industrialized Building System (IBS). This new method of construction can increase productivity and quality of work through the use of better construction machinery, equipment, materials and extensive pre-project planning. This study becomes very necessary since there is yet no organized body, which can provide the necessary information on the building cost comparison between the conventional system and industrialized building system in Malaysias construction industry. This study also addresses the building cost comparison of the conventional system and industrialized building system of formwork system. It provides the details building cost between the conventional system and the formwork system and indicates which of the two is cheaper. The data were collected through questionnaire s urvey and case study, which consisting of institutional buildings. Through the statistical testt-test it is shown that there is a significant difference in cost saving for the conventional system as compared to the formwork system (industrialized building system). The Malaysian construction industry is undergoing a transitional change from an industry employing conventional technologies to a more systematic and mechanized system employing the latest computer and communication technologies. This is vital for the future health of the industry, given the trend towards global competition and the advent of the k-economy. The Industrialized Building System (IBS) has been introduced in Malaysia since the 60s by the use of precast concrete beam-column elements. Since the demand of building construction has increased rapidly, it is necessary to innovate a construction method, which speeds up the building construction process. To sum-up, in general, the IBS is a methodology whereby a local construction industry is driven towards the adoption of an integrated and encouraging key players in the construction industry to produce and utilize pre-fabricated and mass production of the building at their work sites. This will help to enhance the efficiency of construction process, allowing a higher productivity, and quality, time and cost saving. The construction cost of a building using precast components should be assessed in its overall context. The traditional method of costing by material quantities with a fixed factor for labor cost can lead to incorrect estimation. For example, if labor usage is halved, this will more than compensate for a 10% material increase. More importantly, there is saving in time. Also, if properly designed and executed, precast can lead to much better quality of work. The overall cost impact of precast has therefore to take all these factors into consideration. With the rising costs of labor and less assurance of dependable skilled manpower, the trend is that precast construction will become increasingly competitive compared to cast-in-place construction? PRECAST CONCRETE CONSTRUCTION Introduction Every construction material system has its own characteristics which to a greater or less extend influence the layout, span length, construction depth, stability system, etc. This is also the case for precast concrete, not only in comparison to steel, wood, masonry structures, but also with respect to cast in-situ concrete. Theoretically, all joints between the precast units could be made in such a way that the completed precast structure has the same monolithic concept as a in-situ one. However, this is a wrong approach one, which is very labour intensive costly. If the full advantages of precast concrete are to be realized, the structure should be conceived according to its specific design philosophy: Long spans, appropriate stability concept, simple details, etc. Designers should from the very outset of the project consider the possibilities, restrictions advantages of precast concrete, its detailing, manufacturer, transport, erection serviceability stages before completing a design in precast concrete. Precast concrete system enables faster programmed times not affected by weather or labour shortages. Improves buildability early enclosure of dry envelope enables follow-on trades to start sooner. Produces a high standard of workmanship in factory conditions reduces potential for accidents, addresses on-site skill shortage. Has a high quality finish that can be left exposed concretes thermal properties can be exploited in low-energy buildings. PRIMARY FUNCTIONS Keep water out Prevent air leakage Control light Control radiation of heat Control conduction of heat Control sound SECONDARY FUNCTIONS Resist wind forces Control water vapor Adjust to movement Thermal and moisture expansion or contraction Structural movements Resist fire Weather gracefully Easy to install Architectural precast concrete provides architects with an exciting medium when designing facades for a wide range of buildings, from healthcare facilities to shopping malls, commercial office buildings to sports stadiums. Precast concrete provides: Complete thermal protection Continuous air/vapour barrier Effective rain screens Superior lifespan Reduced construction schedule and on-site labour High quality control standards Numerous finish options and colours CATEGORIES OF PRECAST BUILDING SYSTEMS Precast buildings constitute a significant fraction of the building stock in the republics of the former Soviet Union and Eastern European countries. Depending on the load-bearing structure, precast systems can be divided into the following categories: Large-panel systems Frame systems Slab-column systems with walls Precast concrete floor Large-Panel Systems The designation â€Å"large-panel system† refers to multistory structures composed of large wall and floor concrete panels connected in the vertical and horizontal directions so that the wall panels enclose appropriate spaces for the rooms within a building. These panels form a box-like structure (see Figure 1). Both vertical and horizontal panels resist gravity load. Wall panels are usually one story high. Horizontal floor and roof panels span either as one-way or two-way slabs. When properly joined together, these horizontal elements act as diaphragms that transfer the lateral loads to the walls. Depending on the wall layout, there are three basic configurations of large-panel buildings: Cross-wall system. The main walls that resist gravity and lateral loads are placed in the short direction of the building. Longitudinal-wall system. The walls resisting gravity and lateral loads are placed in the longitudinal direction; usually, there is only one longitudinal wall, except for the system with two longitudinal walls. Two-way system. The walls are placed in both directions. Thickness of wall panels ranges from 120 mm for interior walls to 300 mm for exterior walls. Floor panel thickness is 60 mm. Wall panel length is equal to the room length, typically on the order of 2.7m to 3.6 m. In some cases, there are no exterior wall panels and the faà §ade walls are made of lightweight concrete. A typical interior wall panel is shown in Figure 2. Panel connections represent the key structural components in these systems. Based on their location within a building, these connections can be classified into vertical and horizontal joints. Vertical joints connect the vertical faces of adjoining wall panels and primarily resist vertical seismic shear forces. Horizontal joints connect the horizontal faces of the adjoining wall and floor panels and resist both gravity and seismic loads. Depending on the construction method, these joints can be classified as wet and dry. Wet joints are constructed with cast-in-place concrete poured between the precast panels. To ensure structural continuity, protruding reinforcing bars from the panels (dowels) are welded, looped, or otherwise connected in the joint region before the concrete is placed. Dry joints are constructed by bolting or welding together steel plates or other steel inserts cast into the ends of the precast panels for this purpose. Wet joints more closely approximate cast-in-place construction, whereas the force transfer in structures with dry joints is accomplished at discrete points. Frame Systems Precast frames can be constructed using either linear elements or spatial beam-column subassemblages. Precast beam-column subassemblages have the advantage that the connecting faces between the subassemblages can be placed away from the critical frame regions; however, linear elements are generally preferred because of the difficulties associated with forming, handling, and erecting spatial elements. The use of linear elements generally means placing the connecting faces at the beam-column junctions. The beams can be seated on corbels at the columns, for ease of construction and to aid the shear transfer from the beam to the column. The beam-column joints accomplished in this way are hinged. However, rigid beam-column connections are used in some cases, when the continuity of longitudinal reinforcement through the beam-column joint needs to be ensured. The load-bearing structure consists of a precast reinforced concrete space frame and precast floor slabs. The space frame is construc ted using two main modular elements: a cruciform element and a linear beam element. The cruciform element consists of the transverse frame joint with half of the adjacent beam and column lengths. The longitudinal frames are constructed by installing the precast beam elements in between the transverse frame joints. The precast elements are joined by welding the projected reinforcement bars (dowels) and casting the concrete in place. Slab-Column Systems with Shear Walls These systems rely on shear walls to sustain lateral load effects, whereas the slab-column structure resists mainly gravity loads. There are two main systems in this category: Lift-slab system with walls Prestressed slab-column system Precast columns are usually two stories high. All precast structural elements are assembled by means of special joints. Reinforced concrete slabs are poured on the ground in forms, one on top of the other. Precast concrete floor slabs are lifted from the ground up to the final height by lifting cranes. The slab panels are lifted to the top of the column and then moved downwards to the final position. Temporary supports are used to keep the slabs in the position until the connection with the columns has been achieved. In the connections, the steel bars (dowels) that project from the edges of the slabs are welded to the dowels of the adjacent components and transverse reinforcement bars are installed in place. The connections are then filled with concrete that is poured at the site. Most buildings of this type have some kind of lateral load-resisting elements, mainly consisting of cast-in-place or precast shear walls, etc. In case lateral load-resisting elements (shear walls, etc.) are not present, the lateral load path depends on the ability of the slab-column connections to transfer bending moments. When the connections have been poorly constructed, this is not possible, and the lateral load path may be incomplete. Another type of precast system is a slab-column system that uses horizontal prestressing in two orthogonal directions to achieve continuity. The precast concrete column elements are 1 to 3 stories high. The reinforced concrete floor slabs fit the clear span between columns. After erecting the slabs and columns of a story, the columns and floor slabs are prestressed by means of prestressing tendons that pass through ducts in the columns at the floor level and along the gaps left between adjacent slabs. After prestressing, the gaps between the slabs are filled with in situ concrete and the tendons then become bonded with the spans. Seismic loads are resisted mainly by the shear walls (precast or cast-in-place) positioned between the columns at appropri ate locations. Precast concrete Floor The principle advantages of precast floors are speed of construction, absence of scaffolding, large variety of types, large span capacity, economy. Precast floors can also be classified according to their manufacture into totally partially precast floors. Totally precast floors are composed of units, which are totally cast at the plant. After erection, the units are connected to the structure the longitudinal joints are grouted. In some cases a cast in-situ structural topping screed is added. Partially precast floors are composed of a precast part a cast in-situ part. Both parts are working together at the final stage to achieve the composite structural capacity. The main totally precast floor roof types are described hereafter. CONVENTIONAL IN-SITU CONSTRUCTION Conventional Construction Method Conventional construction encompasses traditional forms of structural load-bearing elements; typically composed of concrete, brickwork and structural steel. We are well-versed in all forms of conventional construction and have substantial in-house capacity. The majority of our commercial and unique residential products to date have utilized conventional methods of construction. A number of designers that we have worked with tend to express the structural elements of the construction, from exposed beams, cantilevered slabs and stairs, to exposed structural steelwork. This requires a high degree of accuracy as well as a high level of workmanship; both of which are easily attained using our in-house skills. Conventional building method is defined as components of the building that are pre-fabricated on site through the processes or timber or plywood formwork installation, steel reinforcement and cast in-situ. Conventional buildings are, mostly built of reinforced concrete frames. The tr aditional construction method uses wooden formwork. It is much more costly for construction, which includes labor, raw material, transportation and low speed of construction time. Cast-in-situ Construction Method This system is suitable for a country where unskilled labor is limited. There is no heavy machinery or high technology involved. The system is technically applicable to almost all types of building. Formwork is used as a mould, where wet concrete, is poured into a temporary system. The temporary system also acts as a temporary support for the structures. The objective of in-situ method is to eliminate and to reduce the traditional site based trades like traditional timber formwork, brickwork, and plastering and to reduce labor content. A carefully planned in-situ work can maximize the productivity, speed and accuracy of prefabricated construction. Cast in-situ method uses lightweight prefabricated formwork made of steel/fiberglass/aluminum that is easily erected and dismantled. The steel reinforcement is placed within the formwork as they are being erected and concrete is poured into the mould. When the concrete is set according to the required strength the mould is dismantled. The w orkers can be trained easily to erect the moulds and set the steel reinforcement. Its advantages over the traditional construction method are, its low skill requirement, can be quickly constructed, maintenance is low, structure is durable and cost can be less. In-situ method is to eliminate and reduce the traditional site based trades like traditional timber formwork, brickwork, plastering and to reduce labor content. Carefully planned in-situ work can maximize the productivity, speed and accuracy of prefabricated construction. The formwork system is based on the combination of pre-fabrication and in-situ conventional construction, which features the utilization of permanent concrete for elements instead of conventional timber formwork. Differences Between In situ and Precast Construction Method Labour   Ã‚  Ã‚  Ã‚  Ã‚  Precast construction method only use semi-skilled workers and dont use skill or unskilled- worker in construction process. Economies are generated through reduced requirements for formwork, access scaffolding and less reliance on wet trades. Reduced on-site supervision by the main contractor is also a saving. So for precast construction method, labours are not use 100 percent for making formwork, access scaffolding, and handle wet concrete. Due to speed of construction, gives earlier return on investment, freeing up the project critical path and allowing earlier completion. It is estimated that a precast structure takes up to 20% less time to construct than a similar cast in situ structure, using labour can be late because of rest time and energy of a labour. For quality and accuracy, precast construction methods will more quality n accuracy than in situ. This ensures that reinforcement bars are accurately located and that clients receive high quality products man ufactured to controlled dimensional tolerances. Precast method delivers a high performance product with a quality appearance. Have a high quality finish that can be left exposed concretes thermal properties can be exploited in low-energy buildings because all of the equipment are made up in factory.   Ã‚  Ã‚  Ã‚  Ã‚  In situ construction method use skilled worker, semi-skilled worker, and un-skilled worker in construction process. Labour can amenable to almost any design and labour can alteration the design in last minute construction process. Design can proceed as the structure is built because labour takes a time to build. Construction can proceed independently of weather conditions because workers still can proceed the work even though whether are not good. Construction process is easily used for two way structural systems because labour used two ways structural system in construction process. It is not necessary to pay for crane on site because of labour can take instead of crane functions. Wastage Environmental and manufacturing conditions at a precast concrete plant are easily monitored. The production of precast concrete elements takes place under controlled conditions in enclosed factories. This makes the control of manufacturing, waste, emissions, noise levels, etc. easy compared with the same processes at a building site. The raw material consumption is similar for similar qualities of concrete, whether the production takes place in a factory, at a ready-mix plant or at a building site. The raw material waste in precast concrete production is very small. The process of preparing mild steel reinforcement may be the same for a precaster as for a contractor at a building site, except that precasters will usually have less waste. This results in better utilization of the steel and less consumption of natural resources. Surplus materials are generated during the production of precast elements. Much surplus material is recyclable, and consists mainly of hardened concrete with or without reinforcement, steel reinforcement and pieces of structural steel, plywood and other wooden materials, fresh concrete (from production and washing of equipment), slurry from the sawing of concrete, insulating materials (mineral wool and polystyrene), oil etc. from machinery and paper and other packaging materials. The amount of surplus material varies between factories and different types of production. Studies in the Scandinavian countries have shown that the magnitude is typically about 100 kg of surplus material per m3 of concrete produced. About 40% of the surplus material is fresh and hardened concrete and about 45% is wastewater from washing equipment and sawing slurry generated during hollow core slab production. It is possible to collect and sort different types of surplus materials in precast plants. Excess materials that can be recycled and reused include steel, wood, insulating materials, oil, paper and other packaging materials. Wood can be sorted out, cut and used as industrial firewood, or used for other construction purposes. Buildings are constructed with traditional cast in-situ concrete, using timber formworks. Building that timber formwork was the major contributor to construction waste, accounting for 30% of the total identified waste. Wet trades, such as concreting, masonry, plastering and tiling on-site were considered as the second major waste generator, accounting for 20% of the total on-site waste generated. A recent study demonstrated that the ‘off-cuts from cutting materials were a major cause of wastage during construction. Waste also arises as a result of design concepts and decisions. Case studies in Sri Lanka In the construction industry, it is well known that there is a relatively large volume of material being wasted due to a variety of reasons. The problem of material waste on construction sites is not an isolated issue and is of environmental concern. Therefore, waste minimization has become an important issue in the construction industry. The aim of this research was mainly to identify the pre-cast contribution to the construction waste minimization in the Sri Lankan construction industry, through a comparison of material waste arising from pre-cast, ready-mixed and site-mixed concrete. Data were collected from 27 building construction projects and three concrete elements: slabs, beams, and columns, were considered to quantify construction waste. To compare the wastage due to pre-cast involvement with other types, three categories of building projects were used, including projects using pre-cast concrete elements, in situ concrete elements site mix, and in- situ concrete elements ready mix. The data for the study were collected from 27 multi-storey housing constructions projects, of which, seven projects used pre-cast construction and 20 projects used in situ construction. The wastage was compared between the basic materials used for three types of concrete elements are columns, beams and slabs. In this study, material wastage includes waste arising from manufacturing process at the factory level to the site level. For instance, material waste of pre-cast and ready-mixed concrete were quantified considering the waste arising from manufacturing process at factory level to usage at construction site. However, it was identified that waste during the transportation of ready-mix concrete and pre-cast elements is negligible. Further, waste of pre-cast elements at the site level was also noted as almost zero and, hence only the factory level waste was considered for the analysis. Techniques of material reconciliation were used to analyse the waste of ready-mix concrete and pre -cast elements at the site level, while work studies were used to quantify the waste of site-mixed concrete at the site level and wastage of ready-mix concrete and pre-cast concrete at the factory level. Pre-cast concrete waste The mean wastages of cement, sand and metal amounted to 5.34 per cent, 13.86 per cent and 7.62 per cent respectively showing the lower values compared with the material wastages in the other two situations (Table III). Further, it was shown that there is a noticeable difference in the generation of material waste between pre-casts and in situ (Figures 1 and 2). The main reason behind this may be due to the negligible wastes arisen during transportation and installation at the site. The pre-cast concrete elements transported to the site were stored unit wise by during transportation had been minimized and identified as zero. Since pre-cast elements were supplied according to the required length, waste arising during installation of elements was at a minimum level and waste occurring due to over ordering of materials was also eliminated. Further, the pre-cast elements were produced at factories under proper supervision using steel moulds which can be formed of different sizes. Therefor e, the wastage of materials during manufacturing also reduced to a considerable amount. Site-mixed concrete waste In site-mix concrete, the mean wastages of cement, sand and metal amounted to 14.39 per cent, 25.70 per cent and 16.11 per cent respectively showing higher values compared with the material wastages in other situations (Table III). This large quantity of wastage was identified due to the lack of supervision, inaccurate mixing methods, inappropriate type of equipment used, poor storage of materials and poor quality workmanship and this led to higher waste of materials in ways of excess cement being used to accelerate the curing process, excess concrete being used due to the breaking of form work, higher waste in transit and handling of metal and sand and excess concrete being used in uneven surfaces (e.g. attached concrete column). Ready-mixed concrete waste The mean wastages of cement, sand and metal amounted to 6.61 per cent, 22.31 per cent and 13.01 per cent respectively showing the higher values than material wastages of pre-cast concrete and lower values than material wastages of site-mixed concrete (Table II). Although there was lower wastage at the factory level, the overall wastage of ready-mixed concrete showed higher values. The main reason behind this is the excess ordering of materials, large quantity of concrete remains in pump car and pump pipe and poor quality workmanship at the site level such as breaking of formwork. Case studies in Hong Kong The questionnaire survey revealed that the construction activities were closely related to the amount of waste generated. Timber formwork is the major contributor to construction waste. The wet trades associated with finishing work such as screeding, plastering and tile laying are identified as the second major set of waste generation processes in the construction of buildings. Concrete work and masonry work are the next most significant groups. Site activities need to be emphasised in order to reduce building waste. In general, it was estimated that about 5-10 per cent of materials ended up as waste on building sites. Pecaform foundation formwork is made by laminating a layer of polyethylene to each side of a high tensile steel wire mesh. This combination creates a material that is both light and structurally strong, making it very easy to handle. It can be used for constructing ground beams, pile caps, footings, curved structures, ribbed and waffle slabs. The formwork is cut-to-size and bent to shape at a factory and arrives at site ready for installation. There is no need to strip the formwork after the concrete has cured. Very little waste is produced. A clean and neat site can be obtained in the foundation stage. Large panel formwork compared with traditional timber formwork, metal panel system formwork has several advantages. The use of large panel formwork can save time and labour in erecting, striking and re-erecting the formwork as the panel is handled as one unit. It can also produce a concrete surface much neater than conventional timber formwork and the surface essentially needs no additional applied finishes for levelling. So far, steel is the most popular material used for the formwork and the reusability of steel formwork can be as high as 100 times, and therefore much formwork waste is reduced. On-site waste audit also indicated that large panel formwork was effective in reducing concrete waste generated by loss in concreting and broken formwork, which usually accounts for about 30 per cent of the total concrete waste Prefabricated steel reinforcement system is tailor-made in plants where steel bars are mechanically cut, bent and fabricated. The completed systems are then transported to the sites for use. During the manufacturing process, the steel bars are cut and bent in a more systematic and accurate manner so that the wastage is kept to a minimum. Precast cladding is a new construction method for tiling works in the corridors of public housing projects in Hong Kong. The cladding panels are manufactured in the precast factory. The production processes are: place wall tiles onto the steel mould face down, pour lightweight concrete onto the back of the tiles, and demould after hardening. The tiles are thus cast integrally with the lightweight concrete and no traditional tile fixing by cement mortar or adhesive is required. At the construction site, the positions for holding brackets will be set out, and cladding panels levelled and fixed. The advantages of precast cladding panels are: reduced requirements on skilled labour with better end product quality, less wastage of raw materials and waste generation as wet trades on site such as plastering and tiling are eliminated, flexible time control as no setting and curing time are needed on site, and a cleaner and safer working environment. Machinery sprayed plaster was originally used in civil engineering applications. It now replaces the traditional cement mortar in some building projects. The major difference between the mechanised plaster and the traditional cement mortar is that the former is mixed and applied by means of a mechanised operation whilst the latter is applied and trowelled smooth by hand. The use of machinery sprayed plaster has the benefits of high productivity, low labour demand and less waste. Precast bathroom is an innovative feature in the construction of public housing. The wall, floor and ceiling of the bathroom are prefabricated with concrete as a whole unit and finished with tiles in the factory. PVC sleeves are also left in the structure for the future fixing of drainpipes. It is then transported to the site and installed into the final position of the building structure with the help of a crane. The only work required on site is to install the sanitary fittings, connect plumbing and electricity wiring to the building mains. Wet trades are avoided on site and this reduces material damages and wastage. Pre-cast external wall panels. Traditionally, external wall panels in high-rise residential buildings have been constructed in-situ with concrete panels finished with mosaic tiles. Pre-casting external wall panels enables panels to be pre-finished with the mosaic tiles attached together with windows and louvres installed. Building services provision can also be included. The finishes are fixed in the factory, production is not affected by the weather, a cleaner safer production environment results in stronger bonding and less tile wastage. Pre-fabricated fibre glass water tank. This type of pre-fabrication is an example of saving construction waste by materials substitution. All residential housing units of the New Harmony type include water storage on the roof of the building; the normal design solution is a cast in-situ concrete tank. An alternative to the construction of the cast-in-situ concrete water tank on the roof of the building is the adoption of a pre-fabricated fibre glass tank. Pre-fabricated internal wall panels e.g. dry wall partitions, and gypsum boards may be used to replace concrete or brick walls which are then finished by plastering in-situ. This has the potential to make significant savings in construction waste because a typical residential building would have some 452m2 of internal walls per floor and typically there would be 32 or 40 floors per building. The adoption of this form of construction has minimal impact on the design tasks because the pre-fabricate

Friday, January 17, 2020

Taser-gun heist trio sent for trial

A 22-year-old white woman and two young Hispanic males are being sent for trial in Oklahoma County on charges of stunning a 50-year-old man with an electronic taser gun and then robbing him. During the attack they also beat their victim, kicked him and stabbed him.At a 13 April preliminary hearing, District Court Judge Gregory J Ryan was told that Crystal Grace Harris had taken their victim back to her motel room after she and their victim had spent the evening together at a local casino.The middle-aged man, identified only as â€Å"Mr Brown† during the hearing, said he had come out of the bathroom to discover Harris putting down her phone.  Ã¢â‚¬Å"Two minutes later there was a knock on the door and these two guys came in,† Mr Brown told the Court. â€Å"That made me nervous because I thought I had been set up.†Ã‚  The two men, named as Ricky Lee Meza (22) and Robert E Hill (21), are alleged to have then attacked Mr Brown, beating him up, kicking him and stabbin g him before disabling him with a taser-gun shot.A taser gun, the Court was told, is a hand-held electronic weapon that fires barbs linked by wires to batteries. On touching their target the barbs deliver an electric shock of 50,000 volts-and-more, causing instant short-term paralysis.  After taking their victim’s wallet, money and the keys of his truck, Harris and her two accomplices had been able to get away from the motel before reception had been alerted that a robbery had taken place and called the police.With the incident having occurred in the early evening, there had been witnesses around who were able to say the three had driven off in an old grey-coloured Chevrolet Caprice. The witnesses were also able to tell police the direction the vehicle had taken.As a result of a chance encounter on the road, Harris and the two men were picked up and stopped by County police within 10 minutes of their getaway. A police car heading for the motel in response to the robbery cal l saw a grey Caprice with three occupants going in the opposite direction that matched the description of the getaway car, turned and stopped it after a short and uneventful chase.Identifying Hill as the driver of the car he had stopped, with Harris and Meza as the other people in the car with him, County Police Officer Chris Spillman told the Court that after he had arrested them he had found them to be in possession of Mr Brown’s wallet with his driving license, credit cards and other identifying documents, together with the $1,095 that Mr Brown had reported stolen, and Mr Brown’s truck keys.After Mr Brown had also positively identified Harris, Hill and Meza as the group who had attacked and robbed him, Judge Ryan said he was satisfied he had heard enough evidence to justify sending all three of them for trial on a count of robbery with a dangerous weapon and a second count of stealing Mr Brown’s wallet, money and car keys.  It is understood that at the full jury trial they will also be charged with assault-and-battery arising out of having shot Mr Brown with the taser gun.Bail for Crystal Harris was set at $27,000, with $5,000 for Hill and $3,000 for Meza.  The case has been listed for jury trial on 2 May.Commentary from Our Court Correspondent Oklahoma’s State Constitution provides for a preliminary Court hearing before a Judge to establish whether enough sound, prima facie evidence exists to justify a case being referred for full jury trial. Only at a full jury trial will the alleged offenders be found guilty or not guilty of the charges against them.This is an historic constitutional safeguard to test whether a State prosecution is warranted as legitimate and whether there is a good factual basis for it.Very importantly, one purpose of the preliminary-hearing process is to make sure no one sits in jail waiting to be tried without a reason that has been properly tested before a Judge in Court.Basically, the preliminary hear ing seeks to determine two things: one, is to determine that an indictable crime has actually been committed; and, two, is to establish that there is sound evidence that the defendant or defendants did it.In this case, Mr Brown is alleging that Crystal Harris, Ricky Lee Meza and Robert Hill attacked him, beat him, kicked him, stabbed him, shot a taser weapon at him, took his money and other possessions and fled.As District Court Judge Gregory J Ryan commented to students after the preliminary hearing: â€Å"I’m not making the final determination. I’m just there to make sure that the allegations that the State is arguing have some merit in them — which, in my opinion, they probably have.â€Å"Mr Brown is able to identify all three individuals. Then they (the State) put a police officer on the stand who testified that after the victim had gone into the lobby and said he had been robbed, the police put out an immediate description of the grey-coloured Chevy Capri ce with two Hispanic males and one white female and the direction they had taken.â€Å"Then there was the second police officer who testified he had heard that report and he had just started to head in the direction of the motel when he saw the car go by, chased it and stopped it.â€Å"And he found those three people in the car and after he had arrested them he found the victim’s wallet, victim’s driver’s license and credit cards and another ID in it. And the $1,095 in the wallet that Mr Brown had said was in the wallet, as well as his car key.†As Judge Ryan said: â€Å"I’m not making the final determination. I’m just there to make sure that the allegations that the State is arguing have some merit in them — which, in my opinion, they probably have.†

Thursday, January 9, 2020

Relationship Between Police Intervention And Juvenile...

Stephanie A. Wiley and Finn-Aage Esbensen’s article (2016) research the relationship between police intervention and juvenile delinquency and what polices are ideal for deterring deviance amplification. There are two main theories that initiate America’s juvenile justice system: labeling and deterrence. Essentially, labeling proponents believe that official intervention increases delinquency and, oppositely, deterrence theorists argue that it cracks down on deviancy. Wiley et al. (2016:283) want to â€Å"inform this debate by examining the effect of being stopped or arrested on subsequent delinquent behavior and attitudes†. They hypothesize their results to reflect labeling theorists because delinquency will increase from police contact and†¦show more content†¦Within these, there were 4.905 students in 195 classrooms and 77.9% (3,820) achieved parent consent, 78% (2,972) finished all three waves of data, and method deletion cut it down to the final 2,61 4 students. Wiley et al. initiated four dependent variables—anticipated guilt, neutralization, negative peer commitment, and delinquency frequency--one treatment variable--police contact--and covariate variables—demographics, controls, and risk factors. Furthermore, they used â€Å"propensity score matching to determine whether being stopped or arrested affects subsequent attitudes and behavior† (Wiley et al. 2016: 293). A double-edged sword, the psmatch 2 module for Stata 12.0 decreased the likelihood of poor matches, but dropped over 300 cases that failed to meet within the parameters. The results effectively confirm labeling theorist’s proposition that police intervention furthers, instead of deters, deviance. First, Wiley et al. achieved covariable balance on all the variables. Through their methods, they found that â€Å"arrest is associated with less anticipated guilt, greater acceptance of neutralization techniques, greater negative peer commitment, and more delinquency† (Wiley et al. 2016: 297). Before the results were matched, there were twenty-three more delinquent acts for juveniles who were contacted by police instead of not. Even so, afterShow MoreRelatedThe Effects Of Juvenile Delinquency On Teens864 Words   |  4 Pagesunderdevelopment, deficiency and lack of housing areas. Theses can also affect teens that increase-doing crimes in which it called juvenile delinquency. There are two terms that define juvenile delinquency, 1: conduct by a juvenile characterized by antisocial behavior that is a beyond parental control and therefore subjec t to legal action; 2: a violation of law committed by a juvenile and not punishable by death or live imprisonment. (Cite). In this topic, I will explain more about family factors in whichRead MoreCauses Of Juvenile Delinquency. Authors John Hagan And1601 Words   |  7 PagesCauses of Juvenile Delinquency Authors John Hagan and Bill McCarthy of Cambridge University offer an insight between the relationship between juveniles and their participation to criminal activities. According to them, the primary theories they employed in understanding the dynamics of youth taking to the street are control theory and strain theory (Benjamin, 1999). Through control theory, the authors point out erratic parenting, family deprivation, neglect and abuse and other forms of parental rejectionRead MoreThe Juvenile Justice System Is A State Level System Of Juvenile Correctional Facilities1597 Words   |  7 Pagessystem, about 1 million juveniles under the age of 18 are arrested each year. While violent crimes by juveniles are decreasing, the female juvenile population has grown tremendously. Both girls and boys who are in the juvenile system usually have problems at home and school that have put them at risk for delinquency. This includes maltreatment, poverty or both, and these factors may have a nega tive impact on their adjustment to adulthood. In the state of Connecticut, the juvenile justice system is aRead MoreThe Program Being Implemented Is A Mentoring Program Based Off Of The Successful Model Of Big Brothers Big Sisters1472 Words   |  6 Pagesin order for success. Mentoring has proven to be effective in treating crime and delinquency in multiple crime/offense types. Add to that as well the promising results in regard to drugs and substance abuse, educational improvements, and mental health and behavioral health involved with psychological functioning. In all, this gives credence to a program based on mentoring and using it to treat at-risk youth between the ages of 6 and 18. Setting up this program requires a community partner in orderRead MoreJuvenile Delinquency And Labeling Theory2511 Words   |  11 Pages Juvenile Delinquency and Labeling Theory Kallie Maglione St. John’s University CRM 119 Juvenile Delinquency Dr. Marquis R. White October 23, 2014 Bartusch, D. J., Matsueda, R. L. (1996). Gender, reflected appraisals, and labeling: A cross-group test of an interactionist theory of delinquency. Social Forces, 75(1), 145. Focuses mainly on interactionist theory but uses labeling theory as a type of interaction that affects delinquency. Labeling specifically in relation toRead MoreFamily Risk Factors For Antisocial Behavior Among Young People901 Words   |  4 PagesOJJDP identified several risk factors related to the family who have an established relationship with juvenile delinquency, including factors such as antisocial parents, poor family management practices, child abuse, low levels of parental involvement, and separation between parents and children (Hawkins et al., 2000). Risk factors related to the family, with perhaps the strongest predictive utility for juvenile antisocial behavior are domestic violence. Young people who are exposed to domestic violenceRead MoreJuvenile Crimes1247 Words   |  5 PagesJuvenile crime is a growing problem that endangers virtually every American. Juvenile delinquency is enormously damaging to the health and well-being of the nations families and communities. A juvenile crime can consist of DUI, robbery, rape, minor in possession, weapon in possession anything an adult can be charged with. Individuals under the age of eighteen who commit these crimes can be charged as a juvenile delinquent. Statistics show that most juveniles that commit crimes are in a gang; weatherRead MoreCrj/301full Course All Dqs and Assignments/ (Juvenile Justice)3191 Words   |  13 PagesCRJ/301Full Course All DQs and Assignments/ (Juvenile Justice) Click Link Below To Buy: http://hwcampus.com/shop/crj-301-ashford/crj301full-course-all-dqs-and-assignments-juvenile-justice/ Or Visit www.hwcampus.com CRJ 301 (Juvenile Justice) Complete Class All DQs and Assignments CRJ 301 Week 1 DQ1 Juvenile Justice – Putting it in Perspective. In Chapter 1 of the text, our author talks about â€Å"putting it all into perspective.† After reading chapters 1 and 2 and reviewing the videoRead MoreJuvenile Justice And The Juvenile System4789 Words   |  20 PagesJuvenile Justice Consultant When thinking of reforming the juvenile justice system one has to think; what can we do to make this better for everyone involve? There are some programs that can be implemented when trying to make a change in the juvenile system. The main thing is getting parents or the guardian more involved in the child’s whereabouts. Secondly the community where the youth will have a place to go and have something more constructive to do to keep them out of trouble. Law enforcementRead MoreEssay Juvenile Delinquency5272 Words   |  22 PagesJuvenile Delinquency Amy Cowan CRJ 422 Prof. Angela Hermosillo November 15, 2010 Juvenile Delinquency Introduction Can we as a society truly reduce the rate of juvenile crime and violence? â€Å"Throughout all time there has been delinquency. It may not have had the delinquency label, but it still existed. Juvenile crime is mentioned as far back as ancient Sumeria and Hammurabi, where laws concerning juvenile offenders first appear in written